top of page
Filter by Tag:
Terminal


What does port electrification mean and why is it important?
Implementing port electrification for a healthier coast will require a larger energy load on the existing grid & collaboration among a port (or several ports), port tenants, interested community groups, & electric utility companies. Some of the largest ports in the U.S. have solutions.
Sep 23, 2025


What are the development timelines for the proposed Humboldt offshore wind farm, marine terminal, and associated transmission infrastructure?
Estimated timeline for the Humboldt Bay offshore wind project.
Sep 23, 2025


What is an offshore wind heavy lift marine terminal, and what is its purpose?
The Humboldt Bay Offshore Wind Heavy Lift Marine Terminal Project is a plan proposed by the Humboldt Bay Harbor, Recreation & Conservation District (Harbor District) to develop Redwood Marine Terminal One — a site located just north of the old pulp mill near the town of Samoa on Wigi/Humboldt Bay’s Samoa Peninsula — into a new terminal specifically to facilitate offshore wind development.
Sep 23, 2025


What Is a Green Terminal Strategy and Why Do We Need One?
In May 2023, local environmental activists started a campaign to ask for the Humboldt Bay Offshore Wind Multipurpose Heavy Lift Terminal to be a zero-emission or “green” port. The Humboldt Bay Harbor, Recreation, and Conservation District adopted Resolution 2024-01, committing to the development and adoption of a Green Terminal Strategy for its Heavy Lift Multipurpose Terminal.
Sep 23, 2025


Who is developing the Humboldt Bay Offshore Wind Heavy Lift Marine Terminal?
There is not yet a developer/operator for the Humboldt Bay Offshore Wind Heavy Lift Marine Terminal, which is a project of the Humboldt Bay Harbor, Recreation & Conservation District (Harbor District).
Sep 23, 2025
bottom of page